TAP_Level_3_Submission
TAP Submission Document
Disclaimer
Level III Project
Data Capture Form
Construction Notes
Nose Cone Schematic
Forward Section Schematic
Aft Section Schematic
Electronics Bay Schematic
Electronics Schematic
Recovery Schematic
Post Construction Testing Checklist
Parts Listing
Rocksim Configuration
Rocksim CG/CP
Flight Simulation
Pre-Launch Check List
Pre-Launch Check List (cont)
Pre RSO Inspection Checklist
Pre RSO Inspection Checklist (cont 1)
Pre RSO Inspection Checklist (cont 2)
Launch Pad Checklist